Bill Tierney, Director of Project Development at ProLift Rigging, talks to DCD’s Emma Strutton about the evolution of rigging engineering for data center construction.

Source: DataCenter Dynamics — read the full report at the original publisher.

This is a curated wire item. The Continuum Brief does not republish full third-party articles; this entry links to the original source.