arXiv:2606.24996v1 Announce Type: new Abstract: Forecasting leaderboards rank models by predictive quality, but their winners are often read as deployment-ready top-1 advice. That reading can fail when forecasts are passed through a fixed decision interface, such as an alert threshold, a top-k budget, or a switching-cost policy. We study when a forecast-side winner can be certified as deployment-actionable for a specified interface and deployed utility. We introduce a fail-closed certification protocol whose gates are sufficient evidential conditions for a strong claim: a friction-caused, non-

Source: arXiv cs.LG — read the full report at the original publisher.

This is a curated wire item. The Continuum Brief does not republish full third-party articles; this entry links to the original source.