arXiv:2606.11387v1 Announce Type: new Abstract: Short pretraining runs can reduce experimental cost, but they can also over-promote configurations that only look strong at tiny budgets. We study an auditable staged-promotion protocol for a fixed micro-pretraining runner on two heterogeneous host blocks: Windows A100 and Linux L40S. Starting from twelve prior-screened configurations, we use staged budgets of 2 minutes, 5 minutes, 10 minutes, 60 minutes, and 12 hours, with frozen promotion rules before expensive continuations. The early screens are intentionally treated as unstable: the 5- and 1

Source: arXiv cs.CL — read the full report at the original publisher.

This is a curated wire item. The Continuum Brief does not republish full third-party articles; this entry links to the original source.