Last month FERC gave grid operators 60 days to justify or revise how they connect ‘large loads’ — or the regulator will make the decision for them

Source: Financial Times — Technology — read the full report at the original publisher.

This is a curated wire item. The Continuum Brief does not republish full third-party articles; this entry links to the original source.